DESIGN SOLUTION
FOR EXTERIOR SUBWAY
We started development activities for the Minsk Subway in 2018 by proposing concept drafts of train exterior. By that time preliminary arrangement was already available. This was somewhat adjusted throughout the project which called for considerable changes of already-approved solutions. As an example, front body of head cars was changed several times. This had a serious impact on the graphic design of the front.
The objectives to the development of the new color and graphical design solution for the third line of Minsk Subway were: creating a distinctive memorable image, maintaining the association with Minsk and Minsk Subway, underpinning the high engineering standards of the new cars, attention to passenger safety and functional aspects of operation.